Non-Compliance detail


  
Summary
 
Licence number: 394
Annual Return Start: 18 Nov 2013
Annual Return End: 17 Nov 2014
Date Received: 13 Jan 2015
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.2 HV1 sample run time was 22hrs 6mins due on 31/10/2014 due to electrical failure. A storm caused power outages between Mudgee, Ulan & Gulgong. Power interruption avoidance not feasible. Report on occurrence. Appropriate Action taken by licensee 1
L2.4 Electrical conductivity exceeds the condition criteria of 900 us/cm. Inspection of pipes & dams did not identify any leak. Flows in the Goulburn River diversion were observed to be low although continuous. The limit no longer applies. EPA to monitor future compliance with this condition 1
M2.3 Sample collected at LDP19 during 12-18/5/2014 not collected from flowing outfall. Water sample was collected from a pool of water located behind the v-notch rather than where the water discharges through the v-notch. No adverse impacts. Appropriate Action taken by licensee 1